The building inspection and a timber pest inspection together, in one attendance.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society The building component follows AS 4349.1 and the timber pest component AS 4349.3. What the pest component delivers is a record of evidence and conducive conditions as at the day of attendance. No treating is done and no pest free status is certified.
31 checkpoints across 9 areas on a standard Austral building and pest inspection. On a site under construction we need the lot open and the builder told we are coming. Where a stage is not finished we say so in the report rather than passing it.
Site and drainage findings recorded on Austral jobs, of the kind a pest inspection also weighs.





New Construction Stage Inspections Seven checks through an Austral build, each timed before the work disappears.
Pre-Handover (PCI) Inspections The final list while the last payment is still yours.
Defect Investigation Reports One failure, traced back to what was actually required.
Dilapidation Reports A dated record of your Austral home before the neighbours start building. Instant online pricing for Austral, or contact the booking team.
Because ground that falls toward the house keeps the soil at the footing wet, and moisture next to timber is most of the invitation. It is also one of the cheapest things on any report to put right.
Yes. The gap between the weep holes and the finished ground is the zone where termite activity would have to become visible. Build the ground up over it and you lose both the drainage and the ability to see anything.
No. Treatment and the warranty that comes with it belong to a licensed pest controller. We keep the two apart so the report stays independent of anyone selling a remedy.