Bored pier inspection in Austral

Depth, diameter and cage position, confirmed while the hole is open.

  • After boring and cage placement, before concrete
  • About 1 hour on site
  • Report within 24 hours
Price your Austral inspectionGive us the address and the stage.

Fully licensed & accredited

Stage1 of 7
When to bookAfter boring and cage placement, before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Austral bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Austral builds

Piers appear on Austral lots where the footing has to reach through fill or soft ground toward the creek lines, and on the deeper stepped footings we see around the perimeter beams here. Depth is the whole exercise, and it is the single thing nobody can confirm once concrete is in the hole.

What we find at this stage in Austral

  • Pier depth short of the figure on the engineering
  • Cage off centre so cover is uneven around the pier
  • Spoil or standing water left in the base
  • Cage not seated at the bottom of the bore
  • Reinforcement not supported before the pour
Edge and middle beam reinforcement, Austral
Edge and middle beam reinforcement
Sample findings

Sample defects found during our bored piers inspections in Austral

Annotated findings from Bored piers inspections on Austral builds. Client addresses withheld.

Perimeter beam footing, recorded during a slab pre-pour inspection in Austral
Perimeter beam footing before the pour
Stepped perimeter beam footing, recorded during a slab pre-pour inspection in Austral
Stepped footing at the perimeter
Reinforcement extension, recorded during a slab pre-pour inspection in Austral
Reinforcement extension at a step
Reinforcement extension, recorded during a slab pre-pour inspection in Austral
A second extension detail

The other stages of a Austral build

  1. Slab pre-pour inspection in Austral2Slab pre-pourThe day before the pour, steel and formwork complete
  2. Frame inspection in Austral3FrameOnce frame and trusses are up and the roof is on, before lining
  3. Lock-up (pre-plaster) inspection in Austral4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Austral5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Austral6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Austral7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Austral →

Guides

Construction stage guides for Austral

All guides →

Book a bored piers inspection in Austral

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Austral: common questions

How long is a pier inspection?

Under an hour on a standard lot, longer where the pier count is high or the site is hard to move around.

What if the depth comes up short?

The measured figure goes beside the required figure in the report. Proposing the remedy belongs to the builder and their engineer.

Do you certify footings?

No. Observations are recorded against the engineering; certification is an engineer's function and the report says where one is needed.

Is water in the bore an issue?

It can be, since concrete placed into water loses strength at the base. Recording it lets it be pumped before the pour.

How far out should I call?

As little as a day. Piers are often bored and filled inside two days, so call when the date is set rather than when it is certain.

What should I supply?

Your lot's engineering with pier depths, diameters and positions. Without it we can describe what is there but not confirm it.