In short: Three findings on one Austral property that only make sense together.

What was raised

Cracking in the mortar on an Austral property, reported by the owner as a cosmetic concern.

What the investigation found

Broken roof tiles, a gap at a cladding junction, and cracking through mortar on the wall below.

Reading them together

Water entering at the roof and the junction, arriving in the wall, and movement showing where the masonry is weakest. Three repairs, or one water path.

Why the distinction matters

Repointing mortar under a roof that is still letting water in buys a year. Addressing the path is the actual remedy.

What the report does

Sets out each element, the requirement it fails and the sequence that links them, and says where an engineer is needed.

Written by the Owner Inspections team from inspections carried out in Austral. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More defect reports guides for Austral

All guides →

Book a building inspection in Austral

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Austral owners ask about this

How long does an investigation take?

The report takes two to four working days, compressed where a deadline requires.

Is mortar cracking always significant?

No. Width, pattern and what it follows are what matter, and a report should say plainly when cracking sits inside tolerance.

Do you allocate blame?

We establish the as built condition, the required condition, and how far apart the two sit. Liability is a legal conclusion.

Can this go to NCAT?

It is written to be usable, though the tribunal expects a report to NCAT Procedural Direction 3, prepared separately.