Which way does your ground fall
The cheapest defect on any report, and one of the most consequential.
In short: Site not graded away from the building, recorded on Austral jobs at frame and at handover.
What grading does
Takes surface water away from the building instead of holding it against the footing.
What we recorded
Site not graded on an Austral job at frame stage, and grading still required at lock-up and again at handover on others.
The pest connection
Ground that stays wet at the footing is the primary conducive condition we record. Moisture next to timber is most of the invitation.
The building connection
Water held at the footing on reactive clay is also what drives differential movement, which is what cracks walls.
The fix
Regrading, and making sure downpipes actually discharge somewhere. Cheap, and frequently left to last.
Written by the Owner Inspections team from inspections carried out in Austral. Licensed building practitioners, NSW Fair Trading licence 366177C.